Sailed 300 meters, 19 degrees hot, humid. A rain shower in the afternoon.
This morning we went from the outer guest jetty to the mast crane at the bottom of the Marina
3 men erected the masts very professionally. We got a surprise when the underwire for the main mast was to be set. Two rigging screws were missing. These have disappeared from the mast sometime during the winter. Well, the mast manager looked in his work shop and came up with two used rigging screws. Rigging screws are not cheap, so that may be the reason why they have disappeared.
We then took care of connecting all the electricity and electronics to the masts and mounted all three sails. Everything worked satisfactorily during the test drive.
Tomorrow's forecast is headwind or no wind, so it will probably be motorizing.